16
2021
-
08
Waste transfer station process flow
Author:
The whole compression box bottom installed a set of hydraulic lifting system, the rear of the compression box with a set of compression propulsion cylinder, as well as the filler opening and closing hydraulic system and the front discharge curtain door open and close hydraulic system.
When the top of the compression tank is lowered to parallel to the ground, it will stop automatically. The top of the compression tank is equipped with an automatic opening and closing garbage filler door cover, which opens 110 degrees and closes parallel to the ground.
When the garbage accumulation is close to the packing mouth, start the compression cylinder button "push button" for garbage compression.
When the garbage is compressed to 4m3 volume inside the box, the compression cylinder will be compressed 3 to 4 times, and finally the garbage will be compressed for 1 to 2 minutes to dry out the water, then the compression cylinder will be returned to the position and wait for the subsequent transfer.
News
Introduction of mobile garbage compactor
2021-10-13
Waste transfer station process flow
2021-08-16